title: Tutorial 8 Temperature Control
description: Heating the bed and nozzle safely and efficiently.
---
Tutorial 8 Temperature Control
1. Lesson Header
- Lesson Number: 8
- Level: Beginner
- Title: Temperature Control
- Estimated Duration: 15 Minutes
- Prerequisites: Lesson 1 (Basic G-code)
- What You Will Build: A "Heat Tower" script to test filament temperature.
2. Concept Introduction
The Physics of Melting.
Every filament has a "Goldilocks Zone."
- Too Cold: Layers delaminate (don't stick), extruder skips.
- Too Hot: Stringing, blobs, curling, and degradation.
G-code gives us direct control over the heaters. We have two main heaters:
1. Extruder (T0): Melts the plastic.
2. Bed (B): Helps the first layer stick.
3. Machine State Explanation
Wait vs. Don't Wait
This is the key distinction.
- Set & Forget (M104): "Set the target to 200°C and immediately execute the next line of code." (Multitasking).
- Set & Wait (M109): "Set the target to 200°C and pause the entire machine until it reaches that temperature." (Blocking).
4. Command Breakdown
Set Extruder Temp (M104 S...)
- Syntax: M104 S200
- Use: Preheating while homing.
Wait for Extruder Temp (M109 S...)
- Syntax: M109 S200
- Use: Right before printing starts.
Set Bed Temp (M140 S...)
- Syntax: M140 S60
- Use: Preheating.
Wait for Bed Temp (M190 S...)
- Syntax: M190 S60
- Use: Right before printing starts.
5. Minimal Working Example
A typical "Start G-code" sequence:
M140 S60 ; Set Bed to 60C (Don't wait)
M104 S160 ; Set Nozzle to 160C (Don't wait - prevent oozing)
G28 ; Home all axes (Takes time, so heaters are working)
M190 S60 ; Wait for Bed to reach 60C
M109 S200 ; Wait for Nozzle to reach 200C (Printing Temp)
; Now start printing...
6. Visual Representation
Interactive preview is available in the interactive reader.
7. Build Exercise
Task: Write a script that:
1. Sets the bed to 50°C.
2. Sets the nozzle to 190°C.
3. Waits for both.
4. Extrudes 10mm of filament.
5. Turns off all heaters (S0).
...
Solution:
M140 S50 ; Set Bed
M104 S190 ; Set Nozzle
M190 S50 ; Wait Bed
M109 S190 ; Wait Nozzle
G21
G90
M83
G1 E10 F100 ; Extrude slow
M104 S0 ; Turn off Nozzle
M140 S0 ; Turn off Bed
8. Deep Insight Section
PID Tuning
Your printer doesn't just turn the heater ON or OFF (Bang-Bang control). It uses a PID loop to pulse the power thousands of times a second to hold the temperature steady within 0.1°C.
You can auto-tune this with M303 (advanced command), but G-code just sets the Target (S value).
9. Common Failure Modes
- The "Forever Wait": If your printer can only reach 240°C but you command
M109 S250, it will sit there forever trying to reach it. You must reset the printer. - Oozing during Heatup: If you heat the nozzle to 200°C before homing (
G28), plastic will drool out while the head is moving to the home position. This is why we often heat to 160°C first, home, then heat to 200°C.
10. Real-World Application
Temperature Towers
This is the standard way to find the best temp for a new roll of filament.
- Layer 0-50: Print at 220°C.
- Layer 50-100: Print at 215°C (M104 S215).
- Layer 100-150: Print at 210°C (M104 S210).
You can insert these M104 commands manually into the G-code or use a post-processing script.
11. Final Clean Version
Save this as lesson8.gcode.
; Lesson 8 - The Heat Tower Segment
; Setup
G21
G90
M83
; --- HEATING SEQUENCE ---
M140 S60 ; Bed Target
M104 S190 ; Nozzle Target
G28 ; Home
M190 S60 ; Wait for Bed
M109 S190 ; Wait for Nozzle
; --- SEGMENT 1 (190C) ---
G1 Z0.3
G1 X50 Y50
G1 X100 Y50 E5 F1500 ; Line 1
; --- CHANGE TEMP ---
M104 S210 ; Change target to 210 (Don't wait, keep printing)
; The nozzle will heat up WHILE printing the next lines
; --- SEGMENT 2 (Transitioning to 210C) ---
G1 X100 Y60 E1
G1 X50 Y60 E5
; --- COOL DOWN ---
M104 S0
M140 S0
G28 X0 Y0 ; Park
12. Stretch Challenge
Challenge: Write a "Cooldown" script.
After a print finishes, sometimes we want the fan to stay on until the nozzle drops below 50°C to prevent "Heat Creep" (heat rising up the heartbreak).
Hint: There is no standard "Wait for Cool Down" command in basic G-code, but M109 R50 (Wait for Target and Wait if Cooling) exists in some firmwares (Marlin).
Answer Key:
M106 S255 ; Fan Full Speed
M104 S0 ; Turn off heater
M109 R50 ; Wait for temp to drop to 50
M107 ; Fan Off